The Ventilation Drying System (VDS) shipping carton measures 470×335×305 mm. Conduct the unboxing procedure on a level, stable surface that offers ample workspace and clearance.

Save the shipping carton and all interior foam inserts. This specialized packaging is critical for safe transport, factory service, or extended storage.
|
|
When using a cutting tool, always direct the blade away from your body. Apply slow, even pressure to cut the packaging tape. Avoid excessive force to prevent injuries.
|
|
|
|
Take out the Quick Start Guide and the Drying Temperature Reference Sticker from the foam.

Peel off the tape and remove the plastic bag.
|
|

Move the slide latches of both chambers to the unlocked position.

Open the chamber covers and remove the protective foam.

Remove the accessory kit and the bottom foam.

Verify all included items against the accessories list.
Peel off the tape securing the desiccant compartment.

Each chamber features a desiccant compartment for holding desiccant to absorb moisture and maintain a dry environment.
Tear open the outer packaging of two desiccant packs.

Press the indicated area and flip up the desiccant compartment cover.

Place one desiccant pack and snap the cover back into place.

Do not tear open the desiccant pack or pour the pellets directly into the compartment.
Plug the provided power cord into the power port on the device and connect it to a power source.

Wait a few seconds until a chime sounds. This indicates that the device has powered on normally.

The device supports both connected and standalone modes. For detailed operating instructions, refer to Connecting VDS to the Creator 5 series and Standalone Mode。
Video coming soon.